Callahan Tunnel Rehabilitation

Boston, MA

SUMMARY OF SERVICES EXECUTED

The rehabilitation of the Callahan Tunnel was a critical infrastructure improvement project undertaken to modernize one of Boston’s most heavily traveled transportation corridors and enhance long term operational performance. Serving as a vital connection between downtown Boston, East Boston, and Logan International Airport, the project incorporated advanced waterproofing technologies and accelerated construction methods to ensure efficient execution and minimal disruption to the traveling public. Island Pavement Cutting Co., Inc. performed specialized surface preparation and spray-applied membrane waterproofing services, including shotblasting and abrasive blasting of roadway and curb surfaces, followed by the installation of high-performance waterproofing systems designed to provide superior crack-bridging capabilities, skid resistance, and long-term protection. Through precise planning, skilled execution, and rapid installation, IPCC successfully completed more than 100,000 square feet of membrane waterproofing to the project’s early completion and return to service.

Overview

Client

Massachusetts Department of Transportation

Location

Boston, MA

more projects

Ready to Partner on Your Next Project?

Let’s build safer, stronger infrastructure—together.